How to check the purchase of refined decoration house

Renovating a house is a hassle. It is true that you have modified a house, and you haven’t thought about it if you haven’t renovated it. For those who are in trouble and have better economic conditions, buying a well-decorated house is a good choice. However, the purchase of hardcover repair houses does not mean that you can absolutely worry, purchase, check in, the necessary acceptance is not small. As the renovation of the house is over, the quality of the house decoration cannot be scrutinized. Only from a few details can it be started. Here are suggestions for acceptance of the refined decoration room. For the owners who are renovating, it will be a Good use for reference.

1. Preparation

Inspection of the house is a hard and complicated project. The preparatory work before the start must be in place so that the room can be checked. The purchase contract must be available, and there are many attachments on the contract that are important for the acceptance of the furnishing room, such as the community map and the detailed rules.
Drawings with dimensions of the room type should be prepared before acceptance of the house, not only the layout of the house, but also the drawings of the circuit and the waterway. Before the acceptance of the house, we must take the key, and the number of keys is relatively large. There are floor keys, door keys, water meters, and meter keys. Be careful not to miss it. The decoration material confirmation sheet is also indispensable for acceptance. The above records the brand, style and model of the material, and it is necessary to check the acceptance of the fully furnished room.

2, acceptance structure

It was found that the structure of the fully-decorated room was inconsistent with the contract and must be submitted to the real estate developer prior to arrival. If the resistance was encountered, it could also be reported to the relevant government departments. If only the non-structural problems were found, the house could be hand-written when it was handed over to require real estate records. The company has written a commitment to perform maintenance within a certain time limit. The first step is to inspect the whole house after renovation, check the area, check the orientation of the location, measure the public area, and check whether some outdoor facilities are intact.

Checking the project is often overlooked by many owners and it is considered unlikely that there will be problems. In fact, many owners have been surprised to find that the construction project has been omitted.

The home inspection should pay attention to whether the materials used are consistent with those promised in the contract, whether it is a well-known brand, whether the model styles correspond to each other, etc. Any mistakes should be negotiated in a timely manner. After a small high-rise renovation, such a problem sometimes arises. The floor height is inconsistent with the promise of the developer. The high-rise building that has high tension before the renovation is more likely to become depressed after renovation. Whether or not the balcony can be closed is a common concern for the owner after he has collected the house. The owner of the house must also consider that if the balcony is to be closed in the future, some layouts may need to be changed. Whether the bathroom exhaust hole has been left well is a link that should not be neglected in the acceptance. The ceiling can be opened to check whether the pipeline is installed in place. Some vacant structures must not be neglected. Special attention should be paid to the size and what can be used in the future. For example, the empty space in the kitchen is not enough to place the refrigerator. It is very embarrassing.

3, acceptance of drainage pipes and wire lines

Check the drawings carefully to see if the location of important facilities is changed and the changes should be recorded; the location of this box design should be above the wall, the construction party has made changes, and it is difficult to clarify the responsibility in the future without modifying the design.

First of all, it should test whether the drainage pipe is open, open the tap to discharge water, see if the water is leaking, and then take a look at the water pressure and observe whether the drainage speed is satisfactory. Connect a glass of water under the faucet and observe the presence of rust. If you think there is a problem with the quality of the water supply, ask the developer to provide the water quality inspection certificate issued by the epidemic prevention department. Observe whether the position of the drainage pipe is reasonable and whether there are any traces of water seepage around. Where the leaking water will often leave marks on the wall, you can find it only by careful inspection.

The total power consumption of the home is generally limited, "two-way power supply, lighting, power system shunt" is the most basic requirements, these should be able to reflect the circuit layout in the distribution box. The full-scale renovation room will be used to pull off the power-off test. First, pull down the gate to see if the power supply is completely off; then close the gates separately to see if the branches are completely controlled. To check whether there is electricity in the lamp and socket of each house, whether the phone jack, the wide-band socket, the TV antenna socket, and the emergency socket are accurately located, it is necessary to check with the developer.

Outdoor units of the air conditioners shall reserve seats on the outdoor side of the main halls. The air conditioners shall reserve pipeline holes. All enclosed spaces shall be provided with air-conditioning pipeline passages. Gas pipeline: Under normal circumstances, the gas pipeline should be taken out of the pipeline, so that once there is a gas leak can be found in time, easy to maintain, do not leave hidden security problems, inspection by the way when the water, electricity, gas meter degree is zero.

4, Acceptance of construction quality of day, ground, wall, ground, and wall

These will be directly reflected from the various surfaces of the house and have a great influence on the beauty and function of the house. Acceptance of "days, grounds, and walls" will have many details that require attention. First of all, it is to detect whether the ground is flat or not. Professionals use a spirit level. Everyone can use a table tennis instead. Put the table tennis balls on the ground. Pay attention to see if the corner line of the wall is straight, if the wall is flat, if there is a crack, if it is found that it is necessary to figure out whether it is a structural crack in the house, it is better to call the developer to check it. To check if there is empty drum under the wall, just tap with a small hammer and you can hear if there is no empty drum underneath. If you don't have a hammer or a stick with a hammer, you can use it.

The installation of the ceiling requires that the top corner line be tightly fitted with the surrounding walls, and the tightness between the pinch plates should be the same. There should not be large cracks and tilts, and the ceiling should look smooth and smooth. Testing the floor depends on the overall cooperation, the sense of foot should also be the same, the floor should not have arch deformation or serious color difference, when the test should pay attention to whether the floor to step on a sound. Further floor inspection paint film is smooth, whether the surface has bubbles, scratches; pay attention to check whether the water content of the floor meets the requirements, keel water content is also an important indicator, the keel should be done before laying the drying process.

Wall tiles can be tapped with a hammer to knock down the wall. A hollow drum below 15% of the area under a single wall tile is acceptable. Then you must use a pen to mark it and rework it. In principle, floor tiles are not allowed to exist. drum.

Check the refined decoration room is not just a look on it, but also learn to smell, benzene paint over the standard will make you feel a faint aroma in the room, some paint content of toluene diiso acid is excessive, its steam is toxic, will stimulate the eyes.

5. Acceptance of doors, windows, ladder doors, windows, ladders

These are the key components of interior decoration, unlike the display of heaven, earth and wall, they mainly achieve beautiful decorative effects, and they themselves have very important practical functions, which are essential for everyday life in peacetime. The acceptance of good doors, windows and ladders has very practical significance. Now to inspect the door, the inner side of the wooden
Door Frame should have a smooth surface, usually requires every 2 meters of flatness should be less than 2 millimeters, poor paste or late protection will make this uneven.

Pay attention to verifying whether the plywood of the door frame is parallel to the wall surface. It is easy for people to overlook this point at first, especially when the room is poorly lit, and it seems to be difficult to see from the side for a long time.

Entrance Renovation Children's room Renovation house Renovation house Window layout Paint floor tiles Kitchen wall tiles Bathroom doors Toilet ceiling materials Bathroom wall tiles Bathroom size Bathroom floor tiles Bathroom ceilings Overall bathroom Bathroom design Toilet door size Bathroom leak

Door Base

Door Base

Classical Door Base,Hollow Door Base,Apartment Door Base,Custom Door Base

Zhejiang JiHengKang (JHK) Door Industry Co.,LTD , http://www.zjjhk.com