Decoration find out the sequence of progress in the chest

Decoration

The reason why it is complicated lies in the fact that the projects and types of work involved are too numerous; the reason why decoration is plagued by people is that the important reason is that it is not necessary to talk about so many contents and projects one by one. Especially when the decoration enters the second half, many projects extend from simple communication with decoration companies to a series of links such as electrical appliances and furniture, and the importance of coordination is more prominently reflected. Although formal decoration companies generally give customers a timetable to tell the owner when they should do something, from my experience, the foreman is unreliable and the project manager is unreliable. Designers are not likely to soak in this every day. A site. Therefore, for the owners, many times they still need to personally go through battles to deploy. Therefore, the friends of the owners must be clear about the order of the progress of the project so as to avoid making mistakes. The following will combine my own practical experience to tell everyone about the need to pay attention to the decoration process.

1, the last time the wall paint as far as possible and finally brush

In the so-called process, it was easy to think at the beginning, but it was discovered when the actual timetable was set. There were many projects that had a particular emphasis on the order, and it was only when they had a reasonable effect.

The most obvious example is the painting of wall paint. In general, the authentic decoration will be done after the basic treatment of the wall, brush three times the paint, paint the first two times to say, but this third paint, do not worry. For example, if the hang-up of a wall-mounted air conditioner is installed after brushing the wall paint for the last time, even if the hole is made before, it will inevitably cause the newly-painted wall to get dirty. According to the older generation, it is “very dirty”. The best way is to let the workers of the air-conditioning manufacturers drill holes in the wall first, install self-arching nails that hang air conditioners, etc., and then hang the air conditioner back after brushing the paint. Of course, if the air-conditioning manufacturers may not want to run twice, then the compromise is to allow manufacturers to install the second pass and the third pass of the wall paint, so that the dirty part can be remedied when the last time the paint brush. But even so, when installing air conditioners, they should also be protected on the wall, otherwise they will be too dirty and unclean.

In the same way, the marble window sills that are custom-made at home must also be installed early. The reason is still to be last. It is very likely that the surroundings will be soiled. In addition, the project may not be too threatening to the wall, but after all, the light-colored walls are easily contaminated. Therefore, the basic conditions for creating jobs that may cause dust or prone to bumping are basically That's right.

2, be sure to wait for the wall tile and then set the cabinet

Even more important than paint is the wall tiles and floor tiles. The important emphasis here is on the kitchen. In general, many home cabinets are placed close to the wall. From this point to the end, it is best to go in and get in. For those parts where the tolerance for errors is extremely low, we must wait for the surrounding environment to be fully settled and then implemented.

Talk about my bitter lesson: When the wall tiles of the kitchen were almost on the same floor, please ask the cabinet designer to measure. After the measurement is completed, the designer gives the cabinet length of 3.25 meters. Because at the time, the side wall was still missing two or three bricks, it would be thousands of miles with the bricklayers. We must leave 3.25 meters for the kitchen. Whoever wants to finish, and then stick to the last few bricks, I will go and measure it. It would be 3.23 meters. ! If you pack the door again, it will inevitably make the length shrink! Calling the cabinet designer, it was almost finished and it could not be changed. In desperation, only allow cabinet manufacturers to stop and wait until the door frame is finished. As for whether or not to pay a single fee... Who knows?

So, I have to say you again, nails are nails like this, riveting is riveting work, be sure to wait until everything is completed and say, don't make mistakes like me. Another point to note is that if you need to seal the balcony, try to seal it as early as possible, because from the principle of not sealing the balcony can not be paved the floor and wall of the balcony, so it is best to start early so as not to delay the progress of paving.

3, floor, etc. do not have a ladder to install

Also laid on the ground, wooden floors are more vulnerable to damage than tiles. Although the formal decoration companies, whether paving the floor or the floor, must lay films to protect the finished products, construction on the installed floor is not allowed, but then, even with a layer of plastic film, some things with edges and corners fall. On the ground, it is still easy to grind India - for example, ladders on the ground are absolutely easy to damage the floor.

Therefore, before installing the floor, it is necessary to put on various ceiling lights, to put up the wallpaper, and to put the curtain rod drying rack on. In a nutshell: It's generally true that there are no ladders, no need to use "high-altitude operations," and then lay the floor. At the same time, in order to avoid the leakage of water after the dismantling of the heating water to soak the wooden floor, installing the radiator and re-doing the pressure test should also be completed before this.

Also, if you like my family, prepare a bookcase with a walk-in wardrobe door and an entire wall, it is best to wait until the floor is finished before you measure it, and don’t make it like someone’s “find the floor”. size. The reason is very simple. Like the furniture of an entire wall, the height is not tolerable. Even if the floor thickness is known, but with the following keel, nobody dares to guarantee that it will be truly and "expected." not bad. Well, for the sake of safety, the duration of these days will not be over.

Renovation Steps Renovation Process Renovation Experience Lacquer Heating Window Decoration Design Home Improvement Renovation Find Decoration Company Okay Cabinet Doors Marble Tiles Home Cabinets Marble Cabinets Kitchen Wall Tiles Kitchen Cabinet Doors Floor Tiles Floor Tiles Kitchen Tiles Balcony Tiles ld Tiles

Cap Ridge Roll Forming Machine

Roll Forming Machine,Rolling Machine,Cap Ridge Roll Forming Machine

Mactec Machinery Co., Ltd. , http://www.hzrollformingmachines.com