The most attention should be paid to the inspection room in winter

The most attention should be paid to the inspection room in winter

1, inspection wall:

Winter is the best time to test the quality of the wall, and the quality of the wall is one of the main issues that should be taken care of when picking up a house. In addition to closing the doors to check the soundproofing of the walls, you should also carefully observe whether there are any cracks on the walls. Some contractors often neglect the quality of the walls in order to catch up with the construction period. In winter, due to the cooling of the weather, there are many constructions that do not have Covered, smooth cracks will be prominent, so be sure to pay attention to observation.

2, inspection doors and windows:

The hermeticity of doors and windows is another issue that should be paid attention to. Although you may want to renovate the doors and windows, the quality of the doors and windows often reflect the overall quality of the house and the grasp of the details. There is no particularly good way to verify doors and windows, but cold air in winter is a good indicator of the tightness of doors and windows. In addition, note that observing the seals of the doors and windows is also one of the aspects of inspection.

3, test height:

If the terms of the purchase contract expressly specify the relevant terms, you should preferably check the floor height. Because lowering the storey height is a way for developers to save costs, originally six-storey buildings can be built up to ten floors, but too low ceilings can give people a sense of depression. When inspecting a house, simply check the vertical distance from the ceiling to the ground at the inside corner of the house. It is generally believed that 2.65m is an acceptable height, and less than 2.6m is too short.

4, inspection waterproof:

Whether or not waterproofing is done and quality is a problem that must be paid attention to when picking up a house. Otherwise, after the renovation is completed, it will become very troublesome to find that the leak has to be remedied. The detection method is very simple: in the door joints, plug the waterproof plastic, and stick the various pipe openings with plastic film, and then use the water pipe to put water on the ground. The thickness of the water should not exceed 2cm. Make an appointment with the owners downstairs, and after 2 hours, observe whether the ceiling under the floor can seep water. However, because it is winter, it is important to pay attention to cleaning the water after the inspection to avoid freezing.

5, inspection level:

The so-called housing level refers to the height difference between the door and the balcony door, which is an important indicator of the quality of the housing. The test method is to purchase a plastic tube with a diameter of no more than 5 cm from the hardware store, fill the tube with water, and tighten the two ends to form a connected device. Then fix the end of the pipe to the wall of the doorway of the room, make the water in the pipe 2 cm higher than the ground, and make a mark on the wall; meanwhile, fix the other end of the pipe on the wall of the balcony doorway and at the level of the water surface. Make a mark. Measure the mark on the balcony door, if the range does not exceed 1 to 3 cm, it is a reasonable range, otherwise the error is too large.

In addition, attention should be paid to the leaking of electricity, water, gas, and heating of houses, which are mostly used during the winter season. Therefore, as long as you look closely, you can find out the problems, and some will be removed in future renovations. So long as Take note of it.

Handover Notice Home Inspection Decoration Window Housing Room Heating Door

I Beam Levels

Heavy Duty I-Beam Level,Aluminum I-Beam Level,High Quality I-Beam Level,High Precision I-Beam Level,Light Duty I-Beam Level,Professional I-Beam Level

ZHEJIANG MGS LEVEL INDUSTRY CO.,LTD , http://www.mgslevelss.com