New housing acceptance must pay attention to what is the focus

After getting the house, many people do not know how to check it, and some people think that the quality inspection station has been accepted, and the owner's re-acceptance is suspicion. In fact, in most cases, regardless of the acceptance of inspections, the house is all you want. If you find a problem before signing, you will be more convenient to pursue the developer's responsibility. Therefore, in the acceptance of new houses, you must look carefully. 1. Looking at the wall: I don't know when it started. Looking at the wall turned out to be the most important issue for housing acceptance because the water seepage from the walls of the new house took place from time to time. In the worst case, the walls under the windows of the whole building were seep. But to accept this one, it is best to visit the house on the second day of the heavy rain before going over the building. If there is a problem with the wall at this time, it is almost insignificant. In addition to the seepage of water in the walls, there is a problem that the wall is cracked. A friend once reflected that his family had a crack in a door shape. Later, he asked the developer to know that it was originally an elevator freight port left behind during construction. Later, when it was sealed up, it was handled in a sloppy manner to stay in trouble. 2. Verifying hydropower: First of all, check whether the hydropower of the house is connected. Of course, for some high-end renovations, most of the hydropower will be replaced in the later period, so sometimes these are not critical, but if you do not plan to replace water and electricity, then these things must be carefully accepted. Check the wire, in addition to see if there is electricity, the main thing is to see if the wire meets the quality of the national standard. Then the cross-sectional area of ​​the wire meets the requirements. In general, the wires in the home should not be less than 2.5 square meters, and the air-conditioning line should reach 4 squares. Otherwise, when the air conditioner is used, it is easy to overheat and soften. 3, test waterproof: Here is the waterproof, refers to the kitchen and toilet waterproof. Of course, some of the houses that are currently delivered have already declared that they have not done waterproofing. This requires renovation. If waterproofing is already done at the time of delivery, we have to verify whether the waterproofing is done well. If you do not try it before the renovation, then if you find something leaking when you are renovating, the future maintenance project will be big. You have to remove the floor that has been renovated to make a new waterproof layer. The method of acceptance of waterproofing is: using cement mortar as a door to block the toilet, and then cover it with a plastic bag, then put it in a solid state, and then put the water in the toilet, shallow (about 2cm high) ). Afterwards, the owners who are downstairs are expected to check the ceiling of their home toilet after 24 hours. 4. Inspection pipeline: The pipeline referred to here refers to the drainage/pollution pipeline. Utah is a sewage outlet such as a balcony. When it is accepted, take a water-filled appliance in advance and pour water into the outlet. See if the water is flowing smoothly. Why do you want to accept this? Because during construction, some workers often “stolen” this work when cleaning. Put some cement residue into the drain and run away. If the cement is more viscous, it will clog at the elbow and cause drainage difficulties. 5, test level: its experimental income this, for the general user is a certain degree of difficulty. Ground leveling is the measurement of the horizontal error between the floor and the ground in the doorway that is furthest away from the entrance. Examine this, many times can also reflect the developer's construction quality. Because as the owner, it is impossible to accept the main structure, then the quality can only be seen from these details. Measurement method: go to the hardware store to buy a small transparent water pipe, about 20 meters in length, and then filled with water. First draw a sign 0.5 meters or 1 meter off the ground at the door, adjust the water level of the water pipe to the height of the sign, and find a person to fix it in this position; then move the other end of the pipe to the room farthest away from the door. Look at the height of the water pipe and make a mark. Use a ruler to measure how high this mark is off the ground. The difference in these two levels is the difference in the level of the house. You can also use this method to analogically measure the level difference in the entire house. In general, if the difference is about 2 cm is normal, 3 cm is in an acceptable category. If you go out of this range, you have to pay attention. 6. Check the height: The method is very simple. You should measure the inside corners of the two inside walls. You should measure many places in the house. In general, about 2.65 meters is the accepted range. If the house is less than 2.6 meters, the house has to be considered. This kind of house will make you have to live in a depressing environment in the future. Doing short heights is a very effective cost-saving method for developers. 1) Reduce the total weight, so that the cost of the basic part can be saved. 2) Although it was only reduced by about 10 centimeters, overall, the cost savings are also many, and Utah is still developing a residential area for development. 3) At a certain height, lowering the floor height can create more layers. 7, inspection doors and windows: Here it refers to the acceptance window. The key point of acceptance is the sealing of the acceptance window and the balcony door. The most troublesome aspect of the window's sealability acceptance is that it can only be tried and tested in heavy rain. However, it can generally be confirmed by checking whether the sealant tape is intact and firm. The balcony door generally depends on the level difference between the interior and exterior of the balcony door. I have seen a situation where the level of the balcony is the same as the level of the interior, so that it is difficult to avoid the problem of rain infiltration in heavy rain. 8, other projects: In fact, in addition to the above projects, other acceptance requires more professional knowledge. You may wish to bring a friend who is familiar with the project to check the house. This is the only possible thing. In addition, you can only rely on the quality of the quality inspection part.

Entrance decoration children's room decoration house window house decoration house interior decoration

sbs/app bitumen waterproof membrane

SBS APP Asphalt Roofing Felt,SBS APP Bitumen Waterproof Membrane,SBS APP Roofing Membrane

Choice-Link Trading Co., Ltd. , http://www.wfwaterproof.com