Acceptance of new homes must know the basic process

The first step requires the acceptance of the "Management Regulations for Quality Acceptance of Residential Projects." The developer is required to provide a "Resident Household Quality Acceptance Checklist" when submitting homes to home buyers. The table must detail the appearance of the homes in the home. And the eight dimensions of the deviation, waterproof, water and electricity installation and other acceptance process, existing problems and rectification.
The main content of the acceptance inspection of residential construction projects includes the following: According to the requirements of the design drawings, on the basis of ensuring the safety and reliability of the foundation and main structure of the project, the quality of the perception of the house and the use of functional quality shall be checked.
After the acceptance of the household is qualified, the developer must issue a “Household Project Quality Acceptance Checklist” confirmed by the person in charge of the construction, construction, and supervision unit, and affix the construction quality of the construction, construction, and supervision units. Special chapter. If the quality of the residential project is not acceptable, the construction unit cannot organize the acceptance of the entire project.

The second step, the owner himself, inspected the purchaser, in addition to receiving the relevant acceptance form, he could also check the house himself. The self-checking part mainly includes the following major parts:
First, the size of the house. The size, height, and width of houses are the most problematic, and the area is shrinking. Therefore, special inspections are required.
Second, check whether the bathroom leaks construction unit acceptance requires the storage test. If the buyers do not feel at ease, they can store water in the bathroom and watch the toilets of the lower occupants 24 hours later. If there is no leakage, they are qualified. Top-level tenants should focus on checking whether the roof is leaking when it rains. See if there is a watermark on the corner.
Third, in the inspection of the house to pay attention to whether the kitchen has direct lighting, natural ventilation. Kitchens should be equipped with sinks, stoves, exhaust hoods, etc. or set aside locations.
Fourth, whether according to the standard of decoration for delivery. There are basically two standards for the delivery of a house. The first is the decoration and the second is the decoration. Buyers can check the standard requirements of the house on the relevant website of the Ministry of Construction.
5. Whether the indoor finished products delivered are complete, including whether the interior walls are flat and glossy; whether the floor is flat and clean; whether the window glass and the surrounding glue are even or not.

The third step asks professionals to accept Although buyers can use their own relevant knowledge to conduct their own home inspections, but for some details of the inspection or the need for related professional construction units to conduct, because these inspections require more professional knowledge and equipment.
1. The flatness and verticality of the house walls, and whether the doors and windows are straight and straight.
2. Is the location of the professional pipeline reasonable and the quality pass?
3, whether the quality of various materials in the house is qualified.
4, whether the indoor air quality, insulation, lighting conditions, etc. are qualified.

Entrance decoration restaurant decoration housing house interior decoration window house decoration glass door kitchen glass sliding door bathroom door bathroom door size bathroom size bathroom design drawing bathroom design bathroom waterproof bathroom leaking

Free Standing Fireplace

Led Fireplace Heater,Fireplace Blower Heater,Fireplace Heater

Boge Technology (Shanghai) Co., Ltd. , http://www.shportablefireplace.com