Self-priming non-clogging sewage pump before the start of the preparation and operation

Self-priming non-clogging sewage pump need to be prepared before starting what? In the course of their operation which need to pay attention to? With these questions, then introduce you to small series of self-priming non-blocking Preparation and operation of sewage pump before starting. Self-priming non-clogging sewage pump before the start of the preparation and operation 1, check the pump base, couplings, housings and other connecting parts of the fastener is loose, if loose should be tight. 2, rotating the coupling by hand if there is stuck or abnormal sound and so on. 3, open the pump above the water valve, add storage fluid not less than two-thirds of the volume of the pump body, close the valve. Do not need to boot after boot. 4, connected to the power trial about, from the motor side, clockwise turn. (Prohibited reverse) 5, boot work, observe the pump is running properly. If there is an abnormal phenomenon, should find out the reasons to be excluded. Read more: China Building Water Exhibition Pump Valve Tube Fittings Exhibition Water Expo Xiamen Maritime Exhibition Internet + Forum Yiwu Expo Industry Interconnection (Xiamen) Technology Co., Ltd. Asia Pump Network Editor: He Duanhui (QQ / WeChat:) http://beng.liuti.cn/ (service hotline:)

Stevia Blends

Stevia Blends,Stevia Erythritol Blend,Coffee-Used Stevia Blends,Sugar Substitute Blends

JINING USP INTERNATIONAL CO.,LTD. , https://www.uspintl.com