Precautions for the acceptance process of construction materials

Little Zhongda has a lot of disputes related to decorative materials in the process of home decoration. To sum up the reasons, it is nothing more than people often say "the shuffling of the construction party", and "the owners of the material supply will affect the construction progress and quality." Therefore, material acceptance must be done during the renovation.

>>>Links: Save money for decoration is no longer difficult Materials and construction articles

1) Time of acceptance of the material acceptance of the other party to the contract: After the material has been purchased, the purchaser needs to notify the other party to the contract to prepare for acceptance of the material. And this acceptance is best arranged as soon as the material comes into play. Therefore, the agreed acceptance time is very necessary. In order to prevent material from entering the market, the other party does not have time to accept the material and affect the construction progress.

2) Inspection materials. The acceptance procedure must be rigorous: The inspector should carry out the necessary inspections for each material contract specified in the contract, such as material quality, material brand, material specification, material quantity, etc.

3) The inspector shall sign on the acceptance form: If the inspection result material is qualified, the inspector shall sign the material acceptance form. This is a more complete process.

Construction acceptance home decoration decoration

Phillips Bugle Head Screw

Phillips Bugle Head Screw,Phillips Flat Bugle Head Screw,Bugle Head Cross Recessed Drywall Screw,Phillips Hex Head Self Drilling Screw

Handan Jiankun Hardware Products Co., Ltd , https://www.jkscrew.com