Floor knowledge: What is the condensation time during self-leveling construction?

Floor knowledge: What is the condensation time during self-leveling construction? Under normal circumstances, the longer the retardation time of the slurry, the smaller the loss rate of fluidity with time, the better the operation of the floor construction, but early The strength is reduced or the growth is slow; on the contrary; the greater the loss rate of fluidity over time, the worse the operability of the floor construction, but the early strength increases faster. At the same time, the setting time of the self-leveling floor has a direct impact on the construction rate of the entire ground. In the general state, after the slurry is evenly mixed, the construction must be completed within 30 minutes, otherwise the operability will be affected. Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn

Dock Shelter & Seal

In warehouse loading docks, dock shelters or dock seals are used to enclose the gap between lorry container and warehouse. It can offer good seal and prevent outside dust or air entering warehouse.

We produce several different types dock shelter or dock seal, including Mechanical dock shelter, Insulated pad dock seal, Inflatable dock seal, and Ajustable head dock seal.

Dock Shelter & Seal,Dock Seals And Shelters,Loading Dock Shelters,Dock Door Shelter, Dock Seal, Inflatable Dock Shelter, Mechanical Dock Shelter

SHANGHAI KENVO DOOR CO.,LTD , https://www.kenvodoor.com