When making renovations, beware of workers cutting corners

Under normal circumstances, many owners know that the construction team has the right to cut corners and materials, but it is not known in what aspects it is embodied. Cutting money or losing money is a minor issue. Seriously, it can cause hidden dangers for home decoration. The owner usually pays attention to the following situations when decorating the house:

1, wall paint

Latex paint is the most common wall decoration material at present, and can be painted, rolled or sprayed in specific construction. If the workers are not serious or perfunctory during construction, small color differences often occur. Especially with deeper emulsion paints, this problem is more likely to occur. Latex paints need to be filled with a certain amount of water before use, and the latex paint must be used up once. Paints of the same color are also best painted once. If the wall needs to be repaired after construction, the whole wall should be repainted again.

2, the water pipeline

When the construction team is carrying out renovations, they sometimes dump large amounts of cement, sand, and concrete into the sewers to save time. The direct consequence of this is a serious blockage of the sewer, causing the kitchen and toilet to run out of water due to poor water. Although some projects have no problem in the final acceptance, they always have poor water. They strictly supervise the construction team and cannot use the waterway as a garbage road. After the construction of the waterway is completed, all the basins, basins and bathtubs are filled with water, and then water-proofed to see if the water is unobstructed and the pipeline is leaky.

3, wire connector

When installing electric sockets, switches and lamps, electricians do not wire according to construction requirements. In particular, when consumers use some electric appliances such as water heaters and air conditioners that consume large amounts of electricity, the switches and outlets are heated and even burned, causing great losses to consumers. During the construction, supervise the electrician to strictly follow the operating procedures. After all the switches and sockets are installed, they must be used in practice to see if there are any fevers in these parts.

4, tile and paving

Paving tiles are a highly technical process. If workers cut corners, they are most prone to problems such as empty tiles, missing seams, and cement and adhesives used for laying tiles. If the ratio is unreasonable, there will be problems such as shedding. According to the relevant regulations, it is required that the wall and floor tiles should be flat and firm, with clear patterns, no dirt and no traces of grime, and the surface color is basically the same, the joints are uniform, the plates are free of cracks, drop angles and lack of edges, and the local empty drums must not exceed 5% of the total number. .

5. Wall tick

The buried pipeline must be slotted on the wall and ground in order to bury the pipeline. A few workers perform barbaric construction during the grooving operation, which not only damages the building load-bearing structure, but also may cause damage to other nearby pipelines. Before construction, it is necessary to reconfirm the direction and location of the pipeline with the construction team leader. For different wall structures, the requirements for slotting are not the same: the walls of the load-bearing wall in the house are not allowed to be slotted, and the wall with the insulating layer is easy to cause cracking on the surface after being slotted, and on the ground Slotting, but also be careful not to damage the floor, causing trouble to the residents downstairs.

Home Furnishing Trick Hide Project Three Trees Lacquer Paint Lacquer Paint Switch Bathroom Tile Color Toilet Waterproof Toilet Tiles Bathroom Tiles Bathroom Door Tiles Tiles Kitchen Tiles Ld Tiles

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

H4 Motorcycle LED Bulbs

CHANGZHOU CLD AUTO ELECTRICAL CO.,LTD , https://www.cld-led.com