Hohhot Measures for the Administration of the Improvement of Mineral Resource Management Support and Services

Due to scattered distribution of mineral resources in Hohhot City, low level of work, and the fact that there are few kinds of mineral resources available for development and the reserves are not large, we actively introduce social capital exploration in accordance with the principles of efficient mining and orderly utilization, and carry out mining structure Adjustments were made to optimize the layout of mining development, and the contribution rate of mineral resources to the city’s economic development was improved.

1. Make full use of the verification results of mining rights in the field and carry out annual inspections of mining rights. In accordance with the requirements of the Notice on Strengthening the Annual Inspection of Mining Rights issued by the Bureau, we must make full use of the verification results of the mining rights in the field, actively complete the data improvement work after the replacement of mining rights, and carry out the annual inspection of mining rights. There are 211 mines that should be inspected in the city, and 207 mines are actually inspected. Others are in the process of handling. The verification of existing reserves, information inspection, and data review has basically been completed.

2. Further standardize the development and management of mining resources. In order to promote the sustainable and healthy development of mining economy in our city, we will protect and rationally use mineral resources and strengthen the development and management of mineral resources. In the first half of the year, the city handled a total of 40 mining rights registrations, of which 3 were new, 23 were continued, 2 were transferred, 11 were changed, and 1 had a mining license lost. The entire mining rights approval process was standardized and reasonable, and all of them were in compliance with the country. With regard to relevant regulations of the autonomous region, there is no such thing as unauthorized approval.

3. Seriously carry out the collection of compensation fees for mineral resources. According to the principle of “responsible for staff and timely reporting,” the Bureau ensures that the amount of compensation for mineral resources is accurate, legally levied, and fully paid for. In the first half of the year, the city’s total resource compensation fee was 1,043,8453.6 yuan, an increase of 24.06% over the same period of last year, including 4,174,799.44 yuan for central storage, 15,661,129.29 yuan for autonomous regions, 15,661,129.29 yuan for city-level storage, and 3,314,219.58 yuan for flagship counties, all of which were historical Good level.

4. Actively do construction projects to overhaul mineral resources verification work. In order to avoid or reduce the overriding of important mineral resources, improve the ability to ensure the protection of mineral resources, and ensure the normal construction of the construction projects, the Bureau has to protect the mineral resources, but also conducive to the smooth construction of the project for the principle of improving work efficiency and good service. Actively and conscientiously completed construction projects to verify the verification of mineral resources. In the first half of the year, the SIPO timely verified the overburdened mineral resources of 9 major construction projects including railways, highways, natural gas pipelines and thermal power plants, and reported the verification results to the Ministry of Land and Resources of the autonomous region in a timely manner.

7.5m Measuring Tape

7.5M Measuring Tape,Tape Measure Tool,Precision Tape Measure,Tape Measure For Sale

SHANGQIU CHAOYUE MEASURING TOOLS CO., LTD , https://www.equipmentool.com