Hydropower renovation decoration company makes the most money in hydropower reform

Water circuit transformation is the most important, but for general decoration companies, this is also the most important profit point. Therefore, when designing, it is necessary to strictly control the budget. General decoration companies will use the actual data on the site as the specific figures for the transformation of the water circuit. It is difficult to estimate the reason and refuse to tell you in advance how much money will be spent on the hydropower reform.

As a result, when the landlords checkout, they often find themselves paying more than three to four thousand yuan for this project. This is very passive.

Countermeasures: Prior to the signing of the renovation contract, it is required to design a circuit diagram showing the transformation of the water circuit and strictly calculate the quantities that may occur for the following items in comparison with the drawings: telephone line reconstruction, power socket modification, switch panel reconstruction, waterway reconstruction, cable television line reconstruction, network cable Transformation. And calculate a reasonable fee for this. In this way, it is possible to avoid the increase of the additional costs.

Expert Tips:

Water Circuit Modification Precautions

1 PVC is a material that the country has banned from using as a water pipe. Never use it. Copper tube recommended

2 Dark troughs: That is, all the lines are hidden in the wall. These need to open the groove on the wall to put the casing of the line, the cost is more expensive.

3 The open line: that is, put the thread inside the casing, hidden in the ceiling or under the floor tiles. Relatively cheap

4 The waterway design must first consider all equipment related to water, such as: water purifiers, water heaters, kitchen treasures, toilets and wash basins, their location, installation methods and whether or not hot water is needed.

5 In addition to leaving the bathroom with wash basins, toilets, washing machines, and other outlets, it is also advisable to pick one out, and it is convenient to pick up the water afterwards.

6 Do not use a deep water seal to drain the floor drain of the washing machine, because the water is too slow to meet the needs of the washing machine.

7 Strong and weak wires cannot be in the same pipe and there will be interference.

Villa design Entrance decoration Toilet decoration design TV decoration Socket switch decoration decoration company okay bathroom ceiling material bathroom design bathroom ceiling bathroom sink bathroom floor tile

Sprinkler

Fire Sprinkler,Fire Sprinkler Services,Ul Fire Sprinkler,Fire Safety Sprinkler

Hangzhou Ehase-Flex Co.,Ltd. , https://www.ehasetech.com